Junction Boxes
Series 8118
8
Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Inspect the enclosure for damage.
• Remove any foreign bodies.
• If necessary, clean the connection chamber.
• Check whether the cables have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check if all conductors have been clamped firmly.
• Check whether all covers and partitions for live components have been installed and
fastened.
• Use stopping plugs that have an EC-type examination certificate or an
IECEx Certificate of Conformity to seal unused cable entries and drilled holes.
• Check the tightening torques.
9
Maintenance, Overhaul, Repair
9.1
Maintenance
• Consult the relevant national regulations to determine the type and extent of
inspections.
• Adapt inspection intervals to the operating conditions.
During maintenance of the device, check at least:
• if the conductors are clamped properly,
• compliance with the permissible temperatures (according to EN 60079),
• if the enclosure and seals are damaged.
9.2
Overhaul
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
Observe the relevant national regulations in the country of use.