203681 / 818660300010
2020-06-23·BA00·III·en·04
Commissioning
17
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Optical Fibre Splice Cassette Zone 1
Series 8186
9
Commissioning
Before commissioning, ensure the following:
• Device accepted and certified by a notified body for quality monitoring after installation
in a complete unit of equipment ("U" certificate for an Ex component with partial
approval that is not ready to use on its own).
• Mounting and installation of the device according to regulations.
• No damage to device.
• Remove any foreign objects.
• Fibre optics and cable ties securely locked in the FO splice cassette.
10
Maintenance, Overhaul, Repair
10.1 Maintenance
• Consult the relevant national regulations to determine the type and extent of
inspections.
• Adapt inspection intervals to the operating conditions.
During maintenance of the device, check at least:
• whether the clamping screws holding the electric lines are securely seated,
• whether the device enclosure and / or protective enclosure have cracks or other visible
signs of damage,
• whether the permissible ambient temperatures are observed,
• whether the device is used according to its designated use.
10.2 Overhaul
10.3 Repair
Observe the relevant national regulations in the country of use.
DANGER
Explosion hazard due to improper repair!
Non-compliance results in severe or fatal injuries.
• Repair work on the devices must be performed only by
R. STAHL Schaltgeräte GmbH.