255118 / 815060300340
2017-04-19·BA00·III·en·01
Commissioning
17
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Terminal box
Series G150/1
7
Commissioning
Before commissioning, carry out the following checks:
Check the enclosure for damage.
Check that mounting and installation have been performed correctly. When doing so,
check whether all covers and partitions for live parts have been installed and fastened.
Make sure that all openings/drilled holes in the enclosure are sealed with permissible
components. Dust and transport protection (adhesive tape or plastic caps) fitted at the
factory must be replaced with certified components.
Make sure that seals and sealing systems are clean and undamaged.
If necessary, remove foreign bodies.
If necessary, clean the connection chamber.
Check whether all prescribed tightening torques have been observed.
8
Maintenance and repair
Observe the relevant national regulations in the country of use.
8.1
Maintenance
Check the following points in addition to the national regulations:
• whether the clamping screws holding the cables are securely seated,
• whether the device enclosure and / or protective enclosure have cracks or other visible
signs of damage,
• compliance with the permitted temperatures,
• whether the nut is securely seated.
8.2
Maintenance
Perform maintenance on the device according to the applicable national regulations
and the safety notes in these operating instructions (chapter "Safety").
8.3
Repair
Perform repairs to the device only using original spare parts and after consulting
with R. STAHL.