EN
• Make sure that the LK2 connection has been removed.
• In-line resistor between positions 1 & 6 – R2.
• End-of-line resistor between positions 3 & 4 – R1.
7.3.8 Earth connection
16580E00
8
Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Enclosure must not be damaged.
• If necessary, remove foreign bodies.
• If necessary, clean the connection chamber.
• Check if the conductors have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check if all conductors have been clamped firmly.
• Check if all prescribed tightening torques have been observed.
• Check whether the bayonet lock is tightened firmly.
• Make sure that the plug pin surface is not damaged.
• Use only in completely mounted state.
17547E00
Active / Alarm
1 Switch open – in-line resistor
engaged
2 L / +
3 N / -
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
2
1
2
3
4
5
3
1
R1
6
7
R2