5
Commissioning
28
01.2019
ba
-o
.1
.8
.0
-en
-3
.1
5
Commissioning
The chain hoist has been subjected to a final inspection by the manufacturer in accord-
ance with the EC Machinery Directive.
WARNING
Danger of bodily injury
The test before first commissioning must be carried out by a qualified person, see chapter
1.6.
The safety instructions in chapter 2 must be observed.
This applies for all chain hoists with electric trolley.
An exception is made for chain hoists with maximum working load of <1000 kg with push
trolley or in stationary design.* (Monorail with push trolley, or stationary mounting.)
When the hoist is commissioned and / or after a service call a comprehensive retest must
always be performed.
Test steps
•
Remove sticker from air vent screw in gear
•
Check suspension hook or suspension (visual inspection)
•
Check load chain
- clean and oiled
- must not be twisted
•
Check chain box
- attachment
•
Attach chain stopper to chain with hook at floor level and check chain anchorage
•
Measure and record hook aperture
•
Check that chain drive runs smoothly
•
Check electrical connection
•
Check runway
- clean, free of grease and paint, even
- end stops present
•
Check tightening torque of screw connections of suspension piece or trolley suspen-
sion.
•
Open step of travel drive must be clean and greased.
•
Functional test of all control functions and safety circuits (motions, brakes, emergency
stop, limit switches).
•
Maximum working load of hoist with test loads
Dynamic test: 1.1 x maximum working load
Static test:
1.25 x maximum working load
The test loads must be provided by the user.
•
Function of overload cut-off, see page 33.
•
Confirm that commissioning has been duly carried out in the test logbook.
If required by national regulations, have chain hoist accepted before commissioning.
*
The above exceptions do not apply if your chain hoist is operated on a crane!