Page 75
4.
Apply a thin coat of heat sink grease on the aluminum block of the
new power control board, and attach the board to the frame.
5.
Reconnect all the cables, and reinstall the side cover.
PULLEYS
Idler Pulley Assembly
1.
Remove the side cover.
2.
Disconnect the idler spring from the frame.
3.
Remove the snap ring from the idler pulley assembly mount and
remove the assembly from the frame.
4.
Remove the snap ring from the pulley, and slide the bearings off the
shaft.
5.
Install the new bearings on the idler pulley bracket.
6.
Reassemble the idler pulley assembly on the frame, and ensure that
the lower Poly-V belt aligns with the idler pulley. Reinstall the side
cover.
Intermediate Poly-V Pulley Assembly
1.
Remove the left side cover.
2.
Remove the upper and lower Poly-V belts.
3.
Remove the mounting bolt and washer from the pulley, freeing the
assembly from the frame.
PARTS REMOVAL AND REPLACEMENT
TO REDUCE THE RISK OF EYE INJURY, WEAR EYE PROTECTION WHEN REMOVING
SNAP RINGS.
WARNING
!
Summary of Contents for FREERUNNER 5600
Page 1: ...FREERUNNER 5600 OWNER S MANUAL...
Page 98: ...Page 89 Figure 22 Leg Assembly APPENDIX...
Page 99: ...Page 90 Figure 23 Heel Link Assembly APPENDIX...
Page 101: ...Page 92 APPENDIX Figure 25 Pedal Assembly...
Page 103: ...Page 94 Figure 27 Heel Link Pivot Adjustment APPENDIX...
Page 104: ...Page 95 Figure 28 Handle Assembly APPENDIX...
Page 106: ...Page 97 Figure 30 Power Control Board A APPENDIX...
Page 107: ...Page 98 APPENDIX Figure 31 LED Panel...
Page 108: ...Page 99 APPENDIX Figure 32 Power Control Board B...
Page 109: ...Page 100 APPENDIX Figure 33 Alternator Cable...