background image

 

4

BURNERS / THERMOSTAT OPERATION 
 

1.  After the pilot is lit, turn the gas cock dial to "ON" position. 

2.  Turn the thermostat dial to any temperature setting and observe the burners ignition. It should ignite 

within four seconds. 

 

 

CAUTION: 

Main  burners  shall  not  be  "ON"  when  the  vessel  is  empty.  During 

testing, fill the vessel with liquid (oil or water) till above the heat transfer tubes. 

 

 

FLEXIBLE COUPLINGS, CONNECTORS AND CASTERS 
 

If the unit is to be installed with casters, the installation shall be made with a connector that complies 
with  the  Standard  for 

Connectors  for  Movable  Gas  Appliances,  ANSI  Z21.69  or  Connectors  for 

Moveable  Gas  Appliances,  CAN/CGA-6.16, 

and  a  quick-disconnect  device  that  complies  with  the 

Standard  for 

Quick-Disconnect  Devices  for  Use  With  Gas  Fuel,  ANSI  Z21.41,  or  Quick  Disconnect 

Devices for Use with Gas Fuel CAN1-6.9. 

Locking front casters are provided to limit the movement of 

the appliance without depending on the connector or associated piping. A suitable strain relief must be 
installed with the flexible connector. 
 
Restraining device may be attached to the back frame/panel of the unit. 
 
All connections must be sealed with a joint compound suitable for LP gas and all connections must be 
tested with a soapy water solution before lighting pilots. 

 

PREPARATION FOR USE 
 

New units have a coating of oil on the interior of the vessel. Remove this coating with hot soapy water, 
washing  soda,  or  any  other  grease  dissolving  liquid.  Rinse  thoroughly  and  drain  until  all  residues  are 
removed. Wipe dry. 
 
Clean the baskets, crumb screen. 
 

PILOT OPERATION 
 

Check and make sure the pilot is lit. If not, refer to previous section for lighting the pilot. 

 
BEFORE TURNING THE BURNERS ON 
 

1.  Fill the vessel with liquid shortening or oil up to the "oil level" marking. 
2.  Block  of  solid  shortening  should  not  be  melted  by  setting  it  on  top  of  tubes.  This  will  damage  the 

vessel  and  scorch  fat.  Either  melt  it  first  on  another  appliance  or  cut  into  small  pieces  and  pack 
tightly  below,  between  and  above  the  burner  tubes,  without  leaving  any  air  spaces  around  the 
tubes. Turn the burners "ON" for about 10 seconds and turn "OFF" for about a minute. Repeat this 
"ON-OFF" cycle until all the shortening is melted. If scorching occurs, lower the "ON" time. 

3.  Do not overfill the vessel. 
 

MAIN BURNER OPERATION 
 

After the vessel is filled with liquid shortening or oil, set the gas cock dial on the combination gas valve 
to the "ON" position. 
 
Turn the thermostat to desired temperature setting.

 

Summary of Contents for TRI-STAR TSF Series

Page 1: ...erating and maintenance instructions thoroughly before installing or servicing this equipment Instruction to be followed in the event the user smells gas shall be posted in a prominent location This information shall be obtained by consulting the local gas supplier PLEASE RETAIN THIS MANUAL FOR FUTURE REFERENCES This equipment is design engineered for commercial use only P N 300457 7 13 Phone 1 97...

Page 2: ... proper operation Provisions shall be incorporated in the design of the kitchen to ensure adequate supply of fresh air and adequate clearance for air openings into the combustion chamber for proper combustion and ventilation For proper operation of the appliance do not obstruct the flow of combustion and ventilation air SHIPPING DAMAGE CLAIM PROCEDURE The equipment is inspected crated carefully by...

Page 3: ...mbustible Non combustible Sides 6 0 Rear 6 0 Floor 6 0 Installation on non combustible floor shall be with factory supplied legs or casters OPERATING INSTRUCTIONS WARNING Hot oil and hot surfaces can cause severe burns Use caution when operating the fryer Do not attempt to move the fryer filled with hot oil or shortening Do not go near the area directly above the flue when fryer is in operation Se...

Page 4: ...st be sealed with a joint compound suitable for LP gas and all connections must be tested with a soapy water solution before lighting pilots PREPARATION FOR USE New units have a coating of oil on the interior of the vessel Remove this coating with hot soapy water washing soda or any other grease dissolving liquid Rinse thoroughly and drain until all residues are removed Wipe dry Clean the baskets ...

Page 5: ...mixture of boil out solution and water 4 Relight the pilot and turn on the burners 5 When the solution starts to boil turn off the thermostat and let the vessel soak to soften the deposit and or carbon spots Approximately 1 hour 6 Drain off solution scrub the insides with brush and rinse thoroughly 7 Repeat the cleaning procedure if necessary 8 Wipe dry with soft towels and refill with clean oil s...

Page 6: ...6 TSF TRI STAR FRYER SERIES ...

Page 7: ...3 DOOR HINGE TOP 13 300446 DOOR ASSY FRYER 40 50 14 8717700 DOOR MAGNET 15 2065847 NAMEPLATE TRI STAR SMALL 16 300228 HI LIMIT SWITCH 17 300150 DOOR HINGE BOTTOM 18 300229 KNOB THERMOST WITH DIAL FRYER 19 300113 BRACKET THERMOSTAT HI LIMIT 20 300232 THERMOSTAT FRYER 21 311039 6 CONE LEGS 22 340264 340265 CASTER WITH BRAKE OPTIONAL CASTER WITH OUT BRAKE OPTIONAL 23 300155 SIDE PANEL L H 24 300259 M...

Page 8: ...TAR shall bear the normal labor charges for repair of replacement to the extent that such repair or replacement is performed within 35 miles of the office of an authorized service agency within the continental United States and during regular straight time hours Travel outside of the 35 miles and any work performed at overtime or weekend rates would be the responsibility of the owner user Defectiv...

Page 9: ...9 Phone 1 714 424 9380 Fax 1 714 424 9385 Toll Free 1 866 782 7462 Website www tri starmfg com E mail tristarmfg sbcglobal net TRI STAR MANUFACTURING 729 3rd Avenue Dallas TX 75226 ...

Reviews: