14
Step 1: Disassemble the crib or toddler/day bed.
Using the wrench provided remove the components in the following order:
Loosen footboard bolts & mattress platform bolts.
Remove the footboard
Remove the mattress platform
Remove the crib ends from the crib headboard
Keep and store all the hardware for future assembly of the crib. Store the crib components in a safe
dry place to prevent damage.
Step 2: Attach the side rails and slat roll.
The side rails can be installed in two positions. The lower position is recommended for transition
from the crib to a child’s first full size bed. The bed side rails can be moved to the upper position
after your child adapts to the transition. Under bed storage options can be used with the bed rails
positioned in the upper location. Contact your Stone & Leigh dealer for more information on availa-
ble options.
Install the rails to the headboard and footboard as shown in figure 16.
Insert (4)
3/4”
bolts & (4)
caps
in the headboard to cover the crib assembly holes. Tighten with the
wrench provided. See Figure 15.
Install the slat roll using the screws and instructions provided with the slat roll for proper installa-
tion
.
Converting to a Full Size Bed
Headboard
Figure 15.
See Figure 15.
Cap
Allen Wrench
Connector Bolt
3/4” (1/4” x 20 thread)
1/4” Threaded Rod
Curve Washer
Nut
Wrench
Headboard
See Figure 16.
Summary of Contents for 536-x3-50 BTG
Page 2: ...2...
Page 17: ...2 ADVERTENCIA...