4
UNPACKING AND TESTING APPLIANCE
Carefully remove the appliance from the box.
Prior to installing the appliance, test to make sure the appliance operates properly by
plugging the power supply cord into a conveniently located 240 Volt grounded outlet.
Test all aspects of its operation (manual switches, remote and heater) to make sure all
components operate correctly.
As
with
most
electronic
devices
℉
,
your
new
℃
electric
fireplace
has
been
designed
to
operate
at
temperatures between 5
(41 ) and 3
5
(95 ). During the cold winter months, allow the
fireplace to reach room temperature before turning it on.
NOTE: There may be trace of odor during the first few minutes of initial use. This is
harmless, normal and will never occur again.
LOCATING THE FIREPLACE
Plan where to locate and frame the fireplace. This will save time and money later when you
install the fireplace. Before installation consider the following:
1. Where the fireplace is located must allow for wall and ceiling clearances.
2. Consider a location where the fireplace screen will not be exposed to direct sunlight from
windows or doors.
3.
A 15 ampere, 240 Volt, 50 Hz branch circuit with proper ground must be available at the
location. Preferably a dedicated branch circuit should be provided to avoid circuit
breakers to trip of fuses to blow.
℃
℉
MANTEL CLEARANCE
6"
Fireplace
Mantel
Wall (Combustible facing allowed)
Floor
Fireplace
The clearance to the mantel should be 6”/ 152 mm minimum when a mantel is applied
(Measurement is taken from the glass front).
Summary of Contents for Argon Cube
Page 18: ...EXPLODED VIEW 18 ...