Site Plan
Make sure all tools are charged
Create a site plan with dimensions and
distances
Hang all emulators at required door
locations
Emulators should be placed on the interior
side of the door
Stand with scepter to determine maximum
signal strength for the each emulator –
adjust location(s) for number of emulators
Scepter location determines final antennae
placement
Coordinate network drop(s) for gateways
with customer
Product Installation-Survey Process
QEL Survey Quick Start Guide
16