TURBO TRAINER Manufactured by STAR TRAC OWNER’S MANUAL |
17
10. Lock the grip arms in place (Fig. 11) by threading the large
jam nut onto each pivot shaft and applying the
corresponding final torque to each nut.
Hardware
QTY
M24 x 1.5 Hex Jam Nut
2
Final Torque
48-50 Lb-Ft (65-67.8 Nm)
Fig. 10
11. Secure the left & right grip arms to the crank linkages by
applying final toque (Fig. 12) to the joining bolt and
plugging the bearing housings with the corresponding
plastic caps.
Final Torque
100-110 Lb-Ft (136-149 Nm)
Fig. 11
12. Mount the left & right foot stand mounting plate (Fig. 13) onto
the arm pivot shafts and secure them in place by bolting the
respective button head cap screws thru the center of each plate
and into the pivot shafts.
Hardware
QTY
M8 x 20mm Button Head Bolt
4
Fig. 12