58 |
P a g e
OWNER’S
MANUAL
|
STARTRAC 263 4WD
–
8G
–
STAGE
–
V
5.
Shorten the top link to increase the angle of attachment. Lengthen it to reduce the angle of
attachment.
6.
The top link has three holes for hitching the implement and adjusting its slant.
7.
It also provides a means of adjusting draft control sensitivity, which should be chosen
according to the type of implement used
A.
Fix top link to the lower hole for greater sensitivity (1)
B.
Fix the top link to the upper hole for less sensitivity or if jerking is observed.
4.39
ADJUSTABLE LIFT ROD OR LEVELING ROD
•
In Fig. 4.22 (B) is FIXED LIFT ROD and (C) is the ADJUSTABLE LIFT RODS. It can be adjusted
mechanically or Hydraulically, depending on the lifting, to make the lower links level and
lined up with each other.
•
This will depend on the type of implement being used and the work to be done.
4.40
LATERAL STABILIZERS CHAIN
•
The LATERAL STABILIZERS CHAIN (D) can be set to reduce lateral movement of the lower
links if the three-point linkage contacts with graders, rollers, holes, weeder etc.,
•
Adjust the stabilizers to restrict the side swing of the lower links.
•
When transporting implements that are mounted on the three-point linkage, lateral swing
must be eliminated by tightening the stabilizers.
•
To adjust the stabilizers chain, turn clockwise/ anti-clockwise to increase or reduce lateral
swing.
NOTE:
When an implement is raised to on-road transport position, lateral swing of the three-
point linkage must be reduced.
4.41
LOWER LINKS
•
LOWER LINKS (E) with CAT 1 fixed ball ends.
•
Adjusting the RH and LH vertical lift rods.
•
The two vertical lift rods can be adjusted by means of adjuster arms in order to alter the
lateral angle of the implements.
•
The latter position must be used for implements that require a certain freedom of movement
(cultivators, spreaders, harrows, ploughs).
4.42
HITCHING IMPLEMENTS
1.
Lower the three-point linkage.
2.
Adjust the lateral stabilizer to let the lower links swing freely.
3.
Ensure there is no person or object between the tractor and Implement.
4.
Reverse the tractor on the implement.
5.
Raise the three-point linkage until the hooks on the lower links fasten on to the ball ends
on the implement crossbar and secure them with safety clips.
6.
Adjust the stabilizers to give the right amount of lateral swing for the implement.
7.
Hitch up and adjust the top link.
8.
Use horizontal adjustment for locking the lower links and for adequate sensing.
9.
Also use the float mode. while hitching the implements for ease in hitching
Summary of Contents for 263-4WD-8G-STAGE-V
Page 1: ...OWNER S MANUAL 263 4WD 8G STAGE V OWNER S MANUAL 263 4WD 8G STAGE V EDITION 210312...
Page 3: ...3 P a g e OWNER S MANUAL STARTRAC 263 4WD 8G STAGE V...
Page 5: ...5 P a g e OWNER S MANUAL STARTRAC 263 4WD 8G STAGE V...
Page 37: ...37 P a g e OWNER S MANUAL STARTRAC 263 4WD 8G STAGE V 1 2 3 4...
Page 38: ...38 P a g e OWNER S MANUAL STARTRAC 263 4WD 8G STAGE V 5 7 6...
Page 80: ...80 P a g e OWNER S MANUAL STARTRAC 263 4WD 8G STAGE V 5 65 WIRING CIRCUIT DIAGRAM...