6 Operation
SPR-PRC-POC
41 / 72
6.8 Setting up the job
How to set up the job:
1. Ensure that the machine is switched on
2. In the
Processing order
menu, press the
Setup
button.
Fig. 42: Menu – Processing order
The
Setup > order
menu opens.
Fig. 43: Menu – Processing order
3. Carry out the following steps in the order indicated:
4. Set the assembly type chapter 6.8.1, p. 42.
5. Set the material chapter 6.8.2, p. 43.
6. Set the production quantity chapter 6.8.3, p. 43.
7. Tube size by selecting the tool chapter 6.6, p. 33.