6 Operation
Machine for cutting ring pre-assembly and final assembly
46 / 72
Fig. 51: Menu – Processing order
The input pad for entering the
set pressure
opens.
9. Enter the pressure value (bar) to suit the material and tool
used.
10. Confirm your entry by pressing the green tick.
The input pad closes.
The selected pressure value is shown.
If an error message is shown, refer to chapter 7.2, p. 58
6.9 Preparing the workpiece
The assembly parameters stored in the machine apply
solely to the use of an original STAUFF cutting ring FI-DS-..
in combination with the selected tube material and the
original STAUFF union nut.
Use reinforcing sleeves for thin-walled tubes in
accordance with the STAUFF Connect product
catalogue!
How to prepare the workpiece for assembly:
1. Ensure that …
the tubes are prepared in accordance with the tube and
assembly preparation in the assembly instructions of the
STAUFF Connect product catalogue. Refer to the chapter
Machine-controlled assembly of cutting ring fittings
in the
STAUFF Connect product catalogue.
the job has been set up as described in chapter 6.8, p. 41.
2. Slip the union nut and cutting ring onto the tube end one after
the other.