6 Operation
SPR-PRC-POC
53 / 72
9. Continue assembly until the production quantity is 0.
The job has been processed.
6.11 Checking the product
Use a cone gauge for regular examination of the assembly
stud!
How to check the product:
1. Remove the tube end from the assembly area.
2. Check the cutting ring for correct seating and cutting edge
overlap.
Fig. 60: Overlap when final assembly is selected as assembly type
3. The
Actual data
menu can be used for a quality assessment of
the assembly process. To do this, press the
Actual data
button in
the
Processing order
menu.
The
Edit order > Actual data
menu opens.