4 |
P a g e
REV 03/2012
GENERAL INFORMATION
Units come broken down in panels and are assembled with screws, nuts and bolts on site. All seams &
joints to be caulked with 100% silicone at room temperature (no latex caulking)
Note
: All shower bases need to be leveled in its final resting position, mark the placement, then pull
base out and begin assembly. It is advised to have base onsite before preparing drain location. Access
panel area recommended.
Access panel near controls panel and jets recommended.
Manufacturer reserves the right to change specs or features at anytime. Please check to
confirm details. 1-866-783-2661.