7 |
P a g e
REV 03/2012
Packing List
1.
Check the unit as soon as it arrives. Note if there is any shipping damages, then
notify the distributor.
2.
Check the water and the electronic system and ground are suitable for
installation.
3.
At least two people will be needed for installation.
4.
The following parts should be in the packaged boxes: