TEMPERATURE
START
STOP
®
4
2
1
3
®
®
1½“ Hole
located four feet
from the floor
Double-Sided
Adhesive Pad
IMPORTANT:
Run the Control
Cable through
a ¾” conduit.
Coupler
To SM Series
Steam Generator
C
US
®
Installation & Operating Instructions
01/12
Pub. No. 122-E
- 1 -
Steambath Control
Models: SMC-150
Control Features
1.
Temperature Display: Indicates steamroom or setpoint
temperature.
2.
Start/Stop Keypad: Press keypad and generator will begin
producing steam in a few minutes. The generator will remain on
for 30-60 minutes depending on model. Pressing the keypad a
second time will stop the steam generator.
3.
Steam Icon: Indicates the generator is producing steam when
illuminated. The heater in the generator and the steam icon will
cycle on and off as the temperature is maintained automatically
in the steamroom.
4.
Up/Down Keypads: Press to adjust the temperature setpoint.
IMPORTANT: This control must be installed inside the steam- room
for proper operation of the system.
Cleaning Instructions: Use a damp cloth and mild soap. Do NOT
use abrasive cleaners which might scratch the surface or the base
of the control.
SMC-150 Digital Temperature Control
Installation Instructions
1.
Pre-Installation - Control Location
a) The SMC-150 Control must be installed inside the steam-
room. For convenience the recommended height from the
floor is four feet. Provide a 1½" hole in the wall at this
location (see Figure 1).
IMPORTANT: Multi-conductor cable must be installed so
that the end will not be buried inside the wall. The unit will
not operate unless the control is installed.
2.
Electrical Rough-in
a) Remove the multi-conductor cable from the control packing
box. Carefully route the multi-conductor control cable from
the steam generator to the SMC-150 located inside the
steamroom (see Figure 2 and Figure 3). Route multi-
conductor cable through a ¾" conduit to protect the cable
from damage and to facilitate replacement if necessary.
3.
Control and Cable Installation
a)
Locate the previously installed cable and black plastic strain
relief clamp which is in the control packing box. Locate the
knockout on the steam generator for the control cable (see
Figure 3).
b) Place strain relief around cable about seven inches from the
end and insert into the hole. Remove the protective covering
labeled “Remove Before Installation” from the modular jack
found on the PC board.
c) If SMC-150 is used in conjunction with the optional SMC-
120 control or Dual System, plug the splitter into the
modular jack; this will allow two cables to be plugged into
the PC board (see Figure 3).
IMPORTANT: When used with the optional
SMC-120 control or Dual System, the Steamist
supplied splitter must be used. Locally purchased
telephone splitters will NOT work and void the
warranty.
d) Remove the protective cap from the multi-
conductor cable plug. Connect the cable to the
modular jack.
e) Close and secure generator cover.
f) Locate Telco Jack at female coupler, on back of the
SMC-150 control. Remove the protective covering
Figure 1
WARNING:
Elderly persons, pregnant women, or those suffering from heart disease, high blood pressure, diabetes, or
who are otherwise not in good health, do not use this device unless directed to do so by a physician. Also, do not use
steambath while under the influence of alcohol. For additional Important Safety Information, please see a separate
instruction sheet Pub. No. 199.
!
Important: This control is designed to work only with
Steamist SM series generators.
®