I N S T A L L A T I O N
21
Installation steps :
1.
Positioning & mounting of
SR (S, C, SX or CX)
steam ramp to the ventilation duct wall by
using metal screw
2.
Install the steam hose or rigid steam pipe between the IER steam humidifier and the
steam ramp.
Note: when using rigid stem pipe (stainless steel or copper) it is a good practice to
connect in between the steam ramp, IER humidifier and pipe by using a small length of
steam hose for ease of installation and service.
Allow for a slope of 2° minimum.
3.
Secure all connexion with hose clamps
4.
For SRC or SRCX install a condensate hose in between steam ramp and IER humidifier.
Provide a condensate trap of 8in [200mm] minimum as shown on above figure.
Allow for a slope of 2° minimum
5.
Secure all connexion with hose clamps
Remote Space Blower
Figure 15 – Steam & condensate line for Remote SB
Installation steps :
Please refer to space blower IOM
Summary of Contents for IER-04 Series