or
INSTALLATION INSTRUCTIONS
6
STEP 1 – MAINS WATER CONNECTION
The 5 Stage Reverse Osmosis Filtration System can be
fi
xed in 3 di
ff
erent ways
below are the options:
1. Connecting to
½
” copper pipe where existing plumbing
fi
ttings are available
2. Connecting to
½
” copper pipe
3. Installation with an existing mixer tap/dishwasher tap
OPTION 1
Connecting to
½
” copper pipe where existing plumbing
fi
ttings are available
1. Turn the main water supply o
ff
.
2. Disconnect the compression nut from the copper pipe, install the brass tee to the water supply
valve and reconnect the copper pipe.
3. Take Multi-Function valve and with Hex Key, unscrew the inlet nut by placing the Hex Key into
the key provision inlet spinning nut adaptor and unscrew by turning anticlockwise. Insert the 2
Black Washers into the Multi-Function valve.
4. Using thread tape, thread tape the brass tee. Screw the Multi-Function valve into the brass tee
piece. Ensure Particle Screen is
fi
tted to entry point of Multi-Function valve.
5. Using thread tape, thread tape the ball valve. Select the port you want to use and screw the ball
valve into the port. Thread tape stopper plug for Multi-Function valve and screw into unused port.
CAUTION! Do not use tools or over tighten, hand tighten Multi-Function valve and stopper plug
only.
Summary of Contents for Reverse Osmosis
Page 1: ......