18
STEIN300_Hubzentriereinrichtung_HZEV_03_GB.DOC_D / 02.2020
6
Initial operation
Carry out the following checks before initial operation:
Are all the electric and pneumatic leads and hoses undamaged?
Are all the electric and pneumatic leads / hoses correctly connected?
Have all the mechanical components been tightly fastened in place?
Have all tools and other equipment been cleared from the transport area?
Has all safety equipment been installed and is it working correctly?
Are any hoses or cables in an area where they may get crushed?
Once you have carried out all these checks, you can continue with the initial operation.
Switch on the Transport System and its associated processing stations and carry out
a trial run.
Check the functions of the individual elements and processing stations as well as the
pre-programmed overall operation of the entire system.
Check that the safety equipment is functioning correctly!
WARNING
Only start the Transport System once you have carried out a successful trial run!