background image

8

INSTALLATION

Drill three equally spaced 3.2mm holes into the wall channels (1) and (2) on the

 INSIDE

 of the

screen.

Make sure that your drill holes are more than 20mm back from the glass edge when using
the smallest screen size. Otherwise you risk breaking the glass (see Diagram E).

Make sure that all the holes go though both the aluminium of the fixed side panel and the door
front assembly. Fix off wall channels (1) and (2) to fixed side panels (3) and (4) using the fixed

panel screws (6) and covering them with screw caps (7).

A.  Fasten handle to door.

B.  Fit bottom door seal.

C.  Fit deflector seal to back of door.

D.  Fit additional deflector seal to leading edge of 

front fixed glass.

7

8

DIAGRAM E:

Summary of Contents for GEORGIA ALCOVE

Page 1: ...E JAN 2020 IMPORTANT 1 When you receive your Georgia Square Shower package please check for any freight damage 2 If damage has occurred advise your supplier within 8 hours 3 Do not install any faulty...

Page 2: ...fixing must be provided in the walls behind the wall channels 30mm centre off outside of the acrylic tray 2 Plumbing fittings in the wall need suitable solid fixings 3 All plumbing must be completed b...

Page 3: ...urn panel wall channel PAR5193 1 3 Fixed return panel 1 4 Door front assembly 1 5 Handle set PAR5049 PAR6633 1 6 Fixed panel screws 4 x 10mm Screw Pack PAR7289 PAR8514 12 7 Fixed panel screw caps 10 8...

Page 4: ...X 900 x 750 Square 2 Sided 830mm to 910mm 710mm to 725mm 750 x 900 Square 2 Sided 720mm to 770mm 860mm to 875mm 900x900 Square 2 Sided 830mm to 910mm 860mm to 875mm 1000x1000 Square 2 Sided 930mm to 1...

Page 5: ...arate tray instructions 2 The standard liner is matched if using 10mm Aqualine Gib or similar with clearance each side to allow glue and any minor discrepancies in walls The following table covers the...

Page 6: ...tion Diagram A3 Apply a continuous 7mm bead of silicone on back of channel Fix channel in place with screws checking it remains plumb Diagram A2 A1 A2 A3 Go to the layout plan on pages 4 and 5 to iden...

Page 7: ...r out to have both the Fixed Return Panel and Front Door Panel positioned on the boundary line They should be positioned evenly between both wall channels and aligned to tray edge Drill and fasten off...

Page 8: ...isk breaking the glass see Diagram E Make sure that all the holes go though both the aluminium of the fixed side panel and the door front assembly Fix off wall channels 1 and 2 to fixed side panels 3...

Page 9: ...e shower screen because water can build up over time within the wall channel and leak out of the shower area The screen is designed to allow the water to return into the shower area if any is present...

Reviews: