background image

2

WARRANTY

•  This covers faulty product for 1 year. Check www.stein.co.nz for full details of 

warranty.

•  Any breakage on site will not be covered.

•  The installation must conform to the instructions for the warranty to apply.

HEALTH & SAFETY

•  Glass is heavy and requires two people to handle in most applications.

•  Always stand glass up after unpacking the components and use soft packing when 

in contact with hard surfaces. Take care not to strike an edge or corner on a hard 
surface.

•  All glass is toughened and cannot be reworked or drilled.

•  Wear protective gloves and eye protection.

•  Special care should be taken when drilling walls to avoid hidden pipes or electrical 

cables.

IMPORTANT PREPARATION STEPS!

1. 

Solid fixing must be provided in the walls behind the wall channels. 20mm centre 

off outside of the Acrylic tray.

2. 

Plumbing fittings in the wall need suitable solid fixings.

3.  All plumbing must be completed by a registered plumber and be in place prior to 

being lined.

4.  The wall lining must be a “Wet Area” grade to meet the Building Code.

5. 

The floor must be level and flat without deflection. Walls must be plumb and 
surfaces flat.

6. 

The Acrylic Tray and Liner comes with its own specific instructions. 

TOOLS REQUIRED

 (NOT SUPPLIED)

VIDA SHOWER UNIT SQUARE

WE RECOMMEND A TRADESMAN FAMILIAR WITH THIS TYPE OF INSTALLATION

MATERIALS REQUIRED

 (NOT SUPPLIED)

•  Rags and suitable cleaning materials

• 

Sika Silaflex NG Translucent

Summary of Contents for VIDA

Page 1: ...0 IMPORTANT 1 When you receive your Vida Square Shower package please check for any freight damage 2 If damage has occurred advise your supplier within 8 hours 3 Do not install any faulty product as this will invalidate later claims ...

Page 2: ...en drilling walls to avoid hidden pipes or electrical cables IMPORTANT PREPARATION STEPS 1 Solid fixing must be provided in the walls behind the wall channels 20mm centre off outside of the Acrylic tray 2 Plumbing fittings in the wall need suitable solid fixings 3 All plumbing must be completed by a registered plumber and be in place prior to being lined 4 The wall lining must be a Wet Area grade ...

Page 3: ...hannel 1830 2 Pc 3 Wall Channel Screws ST3 5x35 8 Pc 4 Screw Cap 9 Pc 5 Frame to Wall Channel Screws ST4x10 9 Pc 6 Door Panel 1725x780x6 1 Pc 7 Handle 1 Pc 8 Return Panel 1830x822x5 1 Pc 9 Door Bottom Seal 780 1 Pc 10 Back Door Seal 1760 1 Pc 11 Pivots Top and Bottom 2 Pc 12 Pivot Screw Cap 2 Pc PARTS LIST ...

Page 4: ...re you start read through to get the concept 1 Mark out the wall channels 13mm off acrylic tray edge 2 If the tray is not level or walls are out of plumb protruding or curving inwards more than 4mm recalculation of this position as required Use the Min to Max Table below 3 Plumb and mark the boundary lines of wall channels and predrill a 2mm lead hole in the liner 4 Apply a continuous 7mm bead of ...

Page 5: ... channels Fasten outside corner square up door in frame Align shower screen to tray and wall channels Complete fastenings Join the two panels at corner 5 6 7 5 1 5 2 6 1 6 2 7 1 7 2 7 3 5 3 5 4 7 4 7 5 7 6 7 7 7 8 7 9 2 6 8 8 5 5 5 6 2 INSTALLATION ...

Page 6: ...6 8 9 8 1 8 2 8 3 8 4 9 1 9 9 9 9 6 6 6 6 6 9 INSTALLATION Fit back door seal and make final adjustments to door Fit door parts ...

Page 7: ...er screen because water can build up over time within the wall channel and leak out of the shower area The screen is designed to allow the water to return into the shower area if any is present SCREENS THAT ARE SEALED ON THE INSIDE WILL VOID WARRANTY ALLOW 24 HOURS FOR SILICONE TO FULLY DRY BEFORE USE S ilicone Si licone Seal the join between wall profile and frame 150mm up from base on both sides...

Reviews: