13
Before installation
Before the installation, these matters need to attention.
1.
Products should be put down gently
2.
Acid and alkali environment installation is not recommended.
3.
The product must be grounding
4.
The products are required to check the product brand mark on the voltage and the local
voltage whether conform.
5.
Ensure the power rating should have sufficient current carrying capacity.
For the safe use of the product, the product installation position should guarantee the following.
1.
Minimum height of 1.8 meters from the ground.
2.
Minimum distance of 0.5 meters from ceiling or roof.
3.
Minimum distance of 0.5 meters from both sides of the wall.
Installation steps
1.
Use percussion drilling to create three round holes with a diameter of 8mm. For the 3000
Watts you need to place two brackets.