Installation of the Rain Cap
On the tip of the pole you will install a black cap (Figure 19) with a piece of tubing passing
through it. The purpose of this vent cap is to keep the rain out, yet still allow air flow through
the foam plug into the telescoping pole.
Warning: Press the cap on approximately 1-1/8” (Figure 20). Do NOT press the cap down so
hard as to crimp (damage) the cross tube preventing the pole from properly venting.