202558
COVANA III ‐ Revision 5
19
COVANA LIGHTING — OPTIONAL CHARGER INSTALLATION
IMPORTANT
- Take note that the battery is located on the same short
side as the on and off switch
- Ensure that all hardware is removed securing the outer
shell to the inner shell and no corner brackets are installed
- Lights can be operated while charging
- Lights will operate for 4 hours on a full charge.
1.
Lift the outer shell on the side where the battery is
located to access the connections of the Solar Panel
and battery charger. Do not lift more than
16”(400mm) .
2.
Connect the wires of the charger extension kit to the
connector of the Covana LED lighting kit.
3.
Determine the best corner to locate the charger
connection; generally the back side would be less
visible.
4.
Lower the outer shell back over the inner shell taking
care to ensure the wires are not pinched and are
placed in the slit of the outer shell corner.
5.
Install the corner post bracket; ensuring the wire
comes over the top. Using the bottom bolt of the
bracket fasten the connector in place.
Summary of Contents for COVANA
Page 2: ...202558 COVANA III Revision 5 2 La version française du manuel débute à la page 21 FRANÇAIS ...
Page 8: ...202558 COVANA III Revision 5 8 FRAME DIMENSIONS AND FOOTPRINT ...
Page 12: ...202558 COVANA III Revision 5 12 Wiring Schematic Diagram 120VAC 60Hz Operator North America ...
Page 13: ...202558 COVANA III Revision 5 13 Wiring Schematic Diagram 220VAC 50Hz Operator Europe Only ...