9. Measure and Cut the Top Track
Position the top track near the shower opening with the front side of the track toward the outside of
the shower.
Measure the distance above the jambs from wall to wall.
IMPORTANT!
It is very important that you measure from the pivot end to the strike end of the top track.
Measure from the
pivot side of the top track to the strike jamb side,
then mark the strike jamb
side at the determined distance.
NOTE:
For best results, use a 32-teeth per inch hacksaw blade and miter box. Make the cut on the inside
of the mark with the blade as close as possible to the mark.
Cut the top track at the mark on the strike end.
File the rough edges smooth where the bottom track was cut, taking care to avoid damaging
finished areas.
10. Install the Blocks
Insert the smaller end of the pivot block in the pivot side of the top track.
Important:
Do not cut on
the pivot end.
Front side of
top track
Front side of
top track
Pivot End for
Left Side Pivot
Pivot End for
Right Side
Pivot
Mark and cut on
strike end of top
track.
Cut the Top Track
Install the Pivot Block
Pivot Block
Pivot Block
Insert block into
the pivot side.
Sterling
11
1034026-2-D
Summary of Contents for Pivot Shower Doors SP1500D Series
Page 50: ...1034026 2 D ...
Page 51: ...1034026 2 D ...