background image

 

SSL and SSIL Series Hopper Loaders – Series One Plus Control 

Reference Manual (PN: 882.00149.00) for 

Complete Operation and Installation Instructions 

(Available online at www.acscustomerservice.com)

 

 

Sterling 

Part No:  882.00349.00

 

 

2900 S. 160

th

 Street • New Berlin, WI 53151 USA 

 

 

 

 

Bulletin No: CV1-335.01

 

Tel. 262.641.8610 • Fax 262.641.8653 
 

 

 

Quickstart Installation Checklist 

(Refer to main manual for complete installation instructions) 
 

1.  Mount hopper mounting flange to machine bin or feed throat, using rivets if possible.  

 

2.  Ensure that unit is level for proper operation. 

 

3.  Attach flex hose to unit and pickup wand. Secure it with hose clamps. 
 
4.  Attach clean, dry 80-120psi air. 

 

5.  Plug unit into grounded three-prong receptacle. 

 

 
Unit Operation 

(Refer to main manual for complete operating instructions) 
 

1.  Insert pickup wand into desired material. 
 

2.  Press the 

 

START/STOP

 key. 

 

Note:   The hopper loader loads itself until full, then dumps and repeats.   

                         It pauses only when the machine bin below is full.

 

 

3.  To stop the unit from loading, press the 

 

START/STOP

 key. 

 

For Proportioning Models 
 

1.  Insert pickup wands into desired materials. 
 

2.  Press 

 

SCROLL

 key repeatedly until screen displays “

3

”. 

 

3.  Press the 

 

START/STOP/SELECT

 key to select the “% of MAT’L B” menu. 

 

4.  Use the 

 

UP

 and 

DOWN

 keys to set the desired % of Material B. 

 

5.  Press the 

 

START/STOP/SELECT

 key to set this value. 

 

6.  Press the 

 

START/STOP/SELECT

 key again to start the hopper loader. 

 

Reviews: