SSL and SSIL Series Hopper Loaders – Series One Plus Control
Reference Manual (PN: 882.00149.00) for
Complete Operation and Installation Instructions
(Available online at www.acscustomerservice.com)
Sterling
Part No: 882.00349.00
2900 S. 160
th
Street • New Berlin, WI 53151 USA
Bulletin No: CV1-335.01
Tel. 262.641.8610 • Fax 262.641.8653
Quickstart Installation Checklist
(Refer to main manual for complete installation instructions)
1. Mount hopper mounting flange to machine bin or feed throat, using rivets if possible.
2. Ensure that unit is level for proper operation.
3. Attach flex hose to unit and pickup wand. Secure it with hose clamps.
4. Attach clean, dry 80-120psi air.
5. Plug unit into grounded three-prong receptacle.
Unit Operation
(Refer to main manual for complete operating instructions)
1. Insert pickup wand into desired material.
2. Press the
START/STOP
key.
Note: The hopper loader loads itself until full, then dumps and repeats.
It pauses only when the machine bin below is full.
3. To stop the unit from loading, press the
START/STOP
key.
For Proportioning Models
1. Insert pickup wands into desired materials.
2. Press
SCROLL
key repeatedly until screen displays “
3
”.
3. Press the
START/STOP/SELECT
key to select the “% of MAT’L B” menu.
4. Use the
UP
and
DOWN
keys to set the desired % of Material B.
5. Press the
START/STOP/SELECT
key to set this value.
6. Press the
START/STOP/SELECT
key again to start the hopper loader.