5.
Key F5 and FB1 to fuselage sides. FB1 Spans the fuselage bottom and formers F4/F5. Working from F4 back
– begin tacking FB1 to the formers and Fuselage sides at each tab/notch location.
6.
Install the T-Post former F9. F9 joins the fuselage sides to the former FB1 at the tail of the aircraft. Friction fit
the assembly, check the t-post to ensure that it is square to the work surface, tack into position with thin CA.
7.
Install balsa former F1a. Next laminate F1b Ply firewall to surface of F1a. Complete by laminating F1c and F1d
to face of F1b completing the front firewall. Review plan sheet illustrations for more detail.
© 2003 Stevens AeroModel.
Page 7 of 20