CONTROL STATION
Page CONTROL STATION-8
Z001007/0_4_September 2007
INSTALLATION INSTRUCTION
instrument panel with cable 7m
instrument panel
with cable 1,5 m
extension cable 6,3 m
15. 6. TWIN INSTRUMENT PANELS
15.6.1 Scheme for second instrument panel
standard equipment
optional equipment
Y-branch
NOTE: Oil pressure sender for twin installation must be changed.
ill. 15/10