Z001007/0_4_September 2007
Page QUALITY DIRECTIVES-1
QUALITY DIRECTIVES
INSTALLATION INSTRUCTION
3.1. SPECIFICATION OF SPARE PARTS ..................................................3
3.2. WORKSHOP PROFILE ........................................................................3
3.3. ASSEMBLY OF PLUG CONNECTIONS ..............................................4
3.3.1. Plug connection for steel tube ...............................................4
3.3.2. Plug connection for plastic tube ............................................4
3.3.4. Checking of plug connections ................................................5
3.3.5. Assembly of Raufoss plug systems .......................................5
3.3.6. Sealing of screwed pipe joints ..............................................5
3.3.7. Tightening torque ....................................................................6
3.3.8. Pipe relaying.............................................................................7
3.4. TIGHTENING TORQUES .....................................................................8
3.5. CHECKING OF TORQUE WRENCH ....................................................9
3.6. NONDESTRUCTIVE TESTING OF MATERIALS .................................9
3.7. USE OF ADHESIVE AND SEALING MATERIALS...............................9
3.8. SOLVENT FREE SEALING MATERIALS ............................................9
3.8.1. General directions for use ......................................................10
3. QUALITY DIRECTIVES FOR ASSEMBLY
TABLE OF CONTENTS