12
Assembly bottom support with
fixed dowel pin
First install the base console in accordance with the requirements
(see page 11).
1420014 bottom support 20°/30° 200 V
1420024 bottom support 45°/60° 200 V
1420018 bottom support 20°/30° 240 V
1420022 bottom support 45°/60° 240 V
1420060 bottom support 20° 270 V
1420061 bottom support 30° 270 V
1420062 bottom support 45° 270 V
1420063 bottom support 60° 270 V
1420011 bottom support 20°/30° 200/240/270 H
1420020 bottom support 45°/60° 200/240/270 H
Drill two holes per base console in the existing surface to fix the
fixed dowel pin M10. Pay attention to precise alignment of the two
holes. In addition, all other holes hare to be oriented in exactly one
row (e.g. by a line mark)
1420004 Fastening set for concrete blocks
(with fixed dowel pin)
Then place the base consoles on the ground and secure it with the
added fixed dowel pins M10. All other consoles have to be oriented
exactly in a row (e.g. by a line mark)
Fully assembled fixed dowel pin and console (see figure 1 and 2)
Fig. 1
Fig. 2
Reliable anchoring of the bottom support with the fixed dowelpin is possible in concrete <c25/25 as well as in natural stone that
is resistant to pressure.