16
Assembly of the roof-tile
clamps with lead cloth
Place the first mounting tab in such a way that the lower tile
is covered. Additionally make sure that the mounting tab is
put sideways under the adjacent tiles (bend up mounting tabs
sidewisely).
Mount the upper mounting tab. Bend it up sidewisely. The
screws of the roof-tile clamp have to be covered. Protect the
mounting tab against slipping (e. g. by seaming it to the upper
lath).
The lead cloth has to be positioned in a way that it is
overlapped by the roof tile.
Completely mounted roof-tile clamp.
Further roof-tile clamps in one row have to be
adjusted exactly (e. g. by a line mark).
The roof-tile clamp must not cover the lower tile.
Otherwise a pressure point on the lower tile may arise.
The added foam wedge is placed under the adjacent tiles on
both sides as well as above (protection against splashing water
and snow).