42
Initial operation
VL-RL
Product
Type
(description)
(Serial N°)
Hysteresis
Date of commissioning
Remarks:
Heat transfer medium
Date of assembly
General system checkpoints
Maximum
temperature
Temperature
difference
Setting value
(Control value=*)
Type /Programme
tick accordingly
Net surface
Material
Special
feature
Material
Commissioning report
Summary of Contents for FKF 200
Page 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Page 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Page 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Page 45: ...45 Notes Initial operation...
Page 46: ...46 Notes Initial operation...