26
Assembly of the connecting pipe
The connecting pipe can be adjusted individually. To do this,
the corrugated pipe from stainless steel has to be cut into the
appropriate length. For this purpose, please use a pipe cutter.
Check the pipe ends for impurities, deformations and the ab-
sence of burrs.
Please be aware that only the connecting pipe DN20
l = 15 m can be adjusted individually. Any other
corrugated pipe lines from stainless steel of the STI
programme will be delivered in fixed lengths.
In the next step, the components will be slided onto the pipe
ends according to the drawing alongside. Please pay attention
that the pipe will be pushed all the way through the clinching
ring into the fitting. Fasten the screwcap finger tight. After
-
wards, the bolt nut has to be tightened by 3 1/2 to 4 turns with
appropriate wrenches.
Generally, the whole connection has to be verified for impervi
-
ousness according to the recognized valid rules of engineering
after conclusion.
1320304 Connecting pipe DN20 l=15 m,
PES isolation
Readily mounted connection pipe with screwing.
1320320 Connection set for connection pipe
22 mm connector
1320321 Connection set for connection pipe
22 mm screwing
Readily mounted connection pipe with connector.
Summary of Contents for FKF 200
Page 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Page 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Page 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Page 45: ...45 Notes Initial operation...
Page 46: ...46 Notes Initial operation...