24
After the installation of the system components, the filling of the system with fluid, the venting,
and the adjusting of the installation pressure, the installation is prepared for initial operation.
For initial operation use the factory-adjuted solar controller. Please take further information for
the process of initial operation from the attached manual of the controller.
Report for the initial operation
Builder
Collector type
Number of collectors
Collector expanse
Type of tank
Storage volume
Primary heat source
Heat transfer medium
Frost protection
Height of installation
Content of installation
Pipe length F + BF
Pipe dimension
Date of initial
operation
Executing company
Initial operation