INSTALLATION
Commissioning guide
14
| SOL 29 Premium
www.stiebel-eltron-usa.com
10. Commissioning guide
The installer should fi ll out this sheet at the end of the installation,
and leave it at the installation site.
Site:
System operator:
Installation site:
Collectors:
Collectors (number / type):
Collector surface area:
System specifi cations:
System height:
Pipe run length:
Ventilation:
Solar fl uid (type / concentration):
Max. fl ow rate:
Pump station:
Pump setting (low/med high):
System pressure (cold):
System pressure (hot):
Expansion tank:
Checklist:
Mark for condition (checked, closed, open, etc.)
Pressure relief valve:
Check valves:
Ball valves:
Serial numbers:
Pump station:
Controller:
Software version:
Installation company:
Signature:
Date: