qqqĪZ`.<é<`VHCĪHB
ZH<ŝŌTVB.eBŝĜ
EN
GL
ISH
HC`C`ZHTV`.HC
&CV<.C%HVB`.HC
1. General
information
The chapter entitled "Operation" is intended for appliance users
and contractors.
The chapter entitled "Installation" is intended for contractors.
Note
Read these instructions carefully before using the
appliance and retain them for future reference.
Pass on the instructions to a new user if required.
1.1 Safety
information
1.1.1 Structure of safety information
KEYWORD Type of risk
Here, possible consequences are listed that may result
from non-observation of the safety information.
f
Steps to prevent the risk are listed.
1.1.2 Symbols, type of risk
ZźăĒù
`źĤ¼ĒÏļêń÷
!
Injury
Burns or scalding
Fire
1.1.3 Keywords
:tqHV
¼ńļêĤŒêĒĉ
DANGER
If this information is not observed, it will result in serious
injury or death.
WARNING
If this information is not observed, it can result in serious
injury or death.
CAUTION
If this information is not observed, it can lead to medium
or minor injury.
1.2
Other symbols in this documentation
Note
Notes are bordered by horizontal lines above and below
the text. General information is identified by the symbol
shown on the left.
f
Read these texts carefully.
OPERATION ________________________________________________________ 21
1. General
information _______________________________________ 21
1.1 Safety
information
______________________________________________ 21
1.2
Other symbols in this documentation ______________________ 21
1.3
Units of measurement _________________________________________ 22
2. Safety
________________________________________________________ 22
2.1 Intended
use
_____________________________________________________ 22
2.2 Safety
information
______________________________________________ 22
3. Equipment
description
____________________________________ 22
4. Operation
___________________________________________________ 22
5.
Cleaning, maintenance and care _________________________ 22
5.1 Annual
inspection
______________________________________________ 22
5.2 Self-cleaning
_____________________________________________________ 22
5.3
Checking the system pressure _______________________________ 22
6.
What to do if ... ? ___________________________________________ 23
INSTALLATION _____________________________________________________ 24
7. Safety
________________________________________________________ 24
7.1
Instructions, standards and regulations ___________________ 24
7.2 Safety
information
______________________________________________ 24
8. Equipment
description ____________________________________ 24
8.1 Standard
delivery
_______________________________________________ 24
9. Installation
__________________________________________________ 25
9.1 Preparations
_____________________________________________________ 25
9.2 Pipework
installation
__________________________________________ 25
9.3
Air vent valve ____________________________________________________ 25
9.4 Safety
valve
______________________________________________________ 25
9.5 Drain
facility _____________________________________________________ 25
9.6 Sample
installation
_____________________________________________ 26
10. Installation
__________________________________________________ 27
10.1 Installation
location
____________________________________________ 27
10.2
Lifting onto the roof ____________________________________________ 28
10.3
Fixing the collector _____________________________________________ 28
10.4
Making the collector connections ___________________________ 28
10.5 Roof
outlet
_______________________________________________________ 29
10.6 Collector
sensor
_________________________________________________ 30
10.7
Lightning protection ___________________________________________ 30
10.8 Earthing
system
_________________________________________________ 30
10.9 Expansion
vessel
________________________________________________ 30
10.10 Flushing the pipework _________________________________________ 30
10.11 Connecting the collectors _____________________________________ 31
10.12 Filling the solar thermal system _____________________________ 31
10.13 Pressure test ____________________________________________________ 32
10.14 Checking the system for leaks________________________________ 32
10.15 Completing the filling procedure ____________________________ 32
10.16 Thermal
insulation _____________________________________________ 32
11. Commissioning
____________________________________________ 33
12. Maintenance
________________________________________________ 33
12.1 Maintenance
_____________________________________________________ 33
13. Troubleshooting ____________________________________________ 34
14. Specification
________________________________________________ 36
GUARANTEE | ENVIRONMENT AND RECYCLING _________________ 36
START-UP PROTOCOL _____________________________________________ 37