10
|WDM | WKM | WBM
www.stiebel-eltron.com
INSTALLATION
COMMISSIONING
SW24
2
6
_0
2_
1
0
_0
1
8
8
»
Insert on the water inlet pipes to connect the water heater and
the tap body.
comfort
85
°C
35
55
65
Eco
2
6
_0
2_
1
0
_0
1
9
0
»
Insert the outlet into the tap bodies:
WKM: Pivoting spout
WDM: Shower hose with hand shower fork
WBM: Pivoting arm with shower hose and hand shower fork
WKM
WDM
WBM
2
6
_0
2_
1
0
_0
1
8
9
11 Commissioning
11.1 Filling the water heater
»
Open the right hand tap.
»
Wait until the water is fl owing from the spout without bubbles.
11.2 Checking the maximum fl ow rate
!
With non-pressurised water heater the following
fl ow values must not be exceeded when the
draw-off valve is fully open:
5 l/min with
5 l water heater
10 l/min with
10 l water heater
12 l/min with
15 l water heater
18 l/min with
≥ 30 l water heater
Reduce the fl ow rate if it exceeds the stated limit. This can be done
with the butterfl y valve in the wall connector:
»
Remove the cap.
»
Turn the adjusting screw clockwise with a screwdriver
(see "installation" diagram).