SG 11 , SG 11 PLUS
English
6
N
Stand the tank on a level surface.
N
Fill up with thoroughly mixed plant
protection/cleaning product. Do not
exceed maximum capacity of
1.5 liters (50.5 fl.oz) (see arrow).
N
Fit the cover and tighten it down
firmly.
Pressurizing the Tank
N
Move the pump shaft (1) up and
down uniformly about 20-30 times.
Checking Operation of Pressure Relief
Valve
N
Rotate the knurled wheel (2) as far
as stop.
You should hear air escaping.
Spraying
N
Operate the button (1).
When pressure begins to drop:
N
Move the pump shaft up and down
uniformly – about 15 strokes are
necessary to restore full pressure.
SG 11 PLUS – Adjusting Spray Pattern
Rotate the nozzle to adjust the spray
pattern (solid jet or fine mist).
Filling the Container
1.5 lt
0076BA002 AM
0076BA017 ST
Spraying
1
0076BA004 AS
2
0076BA006 AS
1
0076BA007 AS
0076BA005 ST