Use
4
Handling loads
0252_003-103
0252_003-104
Transporting pallets or other contain-
ers
As a general rule loading units must be trans-
ported one by one (e.g. pallets). Transporting
several loading units at once is only authorised
if
• the safetypreconditions are fulfilled.
• by order of the supervisor,
The operator must ensure that the loading unit
is properly packed. He must only move load-
ing units that have been carefully prepared
and are safe.
1170 801 15 09 [EN]
61
Summary of Contents for EXG-10
Page 2: ......
Page 7: ...1 Introduction ...
Page 20: ...1 Introduction Environmental considerations 14 1170 801 15 09 EN ...
Page 21: ...2 Safety ...
Page 31: ...3 Overviews ...
Page 39: ...4 Use ...
Page 82: ...4 Use Putting Out of Commission and Storage 76 1170 801 15 09 EN ...
Page 83: ...5 Maintenance ...
Page 123: ...6 Technical data ...
Page 135: ......
Page 136: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 1170 801 15 09 EN ...
Page 138: ......
Page 139: ...7 Diagrams ...
Page 146: ...7 Diagrams Electrical installation 140 1170 801 15 09 EN ...
Page 148: ...7 Diagrams Electrical installation 142 1170 801 15 09 EN ...
Page 150: ...7 Diagrams Electrical installation 144 1170 801 15 09 EN ...
Page 151: ...Diagrams 7 Electrical installation Mast tilt option EXG10 EXG12 EXG16 1170 801 15 09 EN 145 ...
Page 152: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 1170 801 15 09 EN ...