Sensitivity
Range
Beam angle
High (3)
2 m
42°
4 m
33°
8 m
22.5°
16 m
20°
24 m
15°
Very high (4)
2 m
45°
4 m
43°
8 m
30°
16 m
22.5°
24 m
18°
–
After the adjustment, refit the cover.
–
Refit the ceiling sensor and connect it.
–
Check that it is working correctly.
Run-on time for additional devi-
ces
Certain additional devices, such as terminals,
take quite a long time to start up when the
truck is switched on. Waiting for the additional
device to start up after a short interruption of
operation is annoying. To avoid this, the run-
on time of the power supply can be adjusted
via the display-operating unit. After the truck
has been switched off, the additional device
continues to be supplied with power during the
run-on time.
–
Activate the "Access authorisation for the
fleet manager".
–
Press the button.
–
Press the softkey.
Operating
4
Auxiliary equipment
350
56368011501 EN - 04/2022 - 13
Summary of Contents for RX20 14-20
Page 2: ......
Page 16: ......
Page 17: ...1 Foreword ...
Page 25: ...Foreword 1 Your truck 9 56368011501 EN 04 2022 13 ...
Page 45: ...2 Safety ...
Page 63: ...Safety 2 Residual risk 47 56368011501 EN 04 2022 13 ...
Page 78: ...Safety 2 Emissions 62 56368011501 EN 04 2022 13 ...
Page 79: ...3 Overviews ...
Page 80: ...Overview Overviews 3 Overview 64 56368011501 EN 04 2022 13 ...
Page 82: ...Driver s compartment Overviews 3 Driver s compartment 66 56368011501 EN 04 2022 13 ...
Page 97: ...4 Operating ...
Page 518: ...Operating 4 Decommissioning 502 56368011501 EN 04 2022 13 ...
Page 519: ...5 Maintenance ...
Page 547: ...Maintenance 5 Preserving operational readiness 531 56368011501 EN 04 2022 13 ...
Page 554: ...Maintenance 5 1000 hour maintenance annual maintenance 538 56368011501 EN 04 2022 13 ...
Page 555: ...6 Technical data ...
Page 599: ......