5
Maintenance
1000-hour maintenance/yearly maintenance
WARNING
Risk of injury!
If the battery carrier is actuated while maintenance
work is being carried out, hands or feet may be
crushed.
– De-energise the truck before performing mai-
ntenance work.
WARNING
Risk of crushing!
If the support rollers swing away when the battery
is inserted, the battery carrier with the battery can
land on feet.
If the catch rails are not clean and are insufficiently
oiled, there is no guarantee that the support rollers
will lock correctly.
To ensure that the oil is evenly distributed and to test
the functionality, fully retract and then fully extend
the battery carrier once after the oiling is complete.
The support rollers must be swung out fully and
locked in position after lubrication.
NOTE
The catch rails of the support rollers are loca-
ted beneath the battery carrier. If necessary
use a mirror to gain a better view.
– Park the forklift truck on level ground.
6210_003-007
– Remove the battery, see "Replacing the
battery with the hydraulic battery carrier".
– Place the battery next to the truck so that the
battery male connector can be reinserted.
The minimum distance between the battery
and the truck must be > 0.5 m. This distance
ensures that the hydraulic battery carrier
actuation buttons can be accessed.
– Connect the battery male connector.
– Retract the battery carrier until the sup-
port rollers are directly underneath (the
battery carrier is then extended by approx.
300 mm).
– Pull out the switch key.
– Push the emergency off switch.
– Disconnect the battery male connector.
414
56338011803 EN - 02/2019 - 09
www.
duma
-rent.com
Summary of Contents for RX60-25
Page 2: ...www duma rent com ...
Page 4: ...www duma rent com ...
Page 14: ...www duma rent com ...
Page 15: ...1 Foreword www duma rent com ...
Page 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Page 39: ...2 Safety www duma rent com ...
Page 71: ...3 Overviews www duma rent com ...
Page 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Page 87: ...4 Operation www duma rent com ...
Page 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Page 385: ...5 Maintenance www duma rent com ...
Page 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Page 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Page 433: ...6 Technical data www duma rent com ...
Page 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Page 469: ...www duma rent com ...
Page 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...