Driving on loading bridges
DANGER
Risk of accident from the truck crashing!
Steering movements can cause the tail end to veer
off the loading bridge towards the edge. This may
cause the truck to crash
The lorry driver and the truck driver must agree on
the lorry's departure time.
–
Establish the departure time of the lorry.
–
Determine the total actual weight of the truck.
–
Before driving across a loading bridge, ensure
that it is properly attached and secured and has a
sufficient load capacity (lorry, bridge etc.).
–
Ensure that the vehicle onto which you will be
driving is secured to prevent it from shifting and
that it can support the load of the truck.
Determining the total actual weight
–
Park the truck securely.
–
Determine the unit weights by reading the
truck nameplate and, if necessary, the at-
tachment (variant) nameplate and, if neces-
sary, by weighing the load to be lifted.
–
Add the determined unit weights to obtain
the total actual weight of the truck:
Tare weight (1)
+ Max. permissible battery weight (2)
+ Ballast weight (variant) (3)
+ Attachment net weight (variant)
+ Weight of the load to be lifted
+ 100 kg allowance for driver
= Total actual weight
–
Drive slowly and carefully on the loading
bridge.
6210_001-010
Type-Modèle-Typ / Serial no.-No. de série-Serien-Nr. / year-année-Baujahr
Rated capacity
Capacité nominale
Nenn-Tragfähigkeit
Battery voltage
Tension batterie
Batteriespannung
Rated drive power
Puissance motr.nom.
Nenn-Antriebsleist.
Unladen mass
Masse à vide
Leergewicht
max
min.*
kg
kg
kg
kg
kg
kW
V
*
* see Operating instructions
voir Mode d'emploi
siehe Betriebsanleitung
D-22113 Hamburg
Berzeliusstr. 10
1
3
2
Operating
4
Handling loads
190
56358042501 EN - - 11
Summary of Contents for RX60-60
Page 2: ......
Page 13: ...1 Foreword ...
Page 20: ...Overview Foreword 1 Your truck 8 56358042501 EN 11 ...
Page 41: ...2 Safety ...
Page 70: ...Safety 2 Emissions 58 56358042501 EN 11 ...
Page 71: ...3 Overviews ...
Page 83: ...4 Operating ...
Page 336: ...Operating 4 Decommissioning 324 56358042501 EN 11 ...
Page 337: ...5 Maintenance ...
Page 344: ...Maintenance 5 General maintenance information 332 56358042501 EN 11 ...
Page 381: ...6 1000 hour maintenance annual mainte nance ...
Page 385: ...7 Technical data ...
Page 398: ...Technical data 7 Fuse assignment 386 56358042501 EN 11 ...
Page 407: ......
Page 408: ...STILL GmbH 56358042501 EN 11 ...