The operating company must also fulfil the fol-
lowing prerequisites:
●
Design documents, test documents and as-
sembly instructions associated with the
modification must be permanently archived
and remain accessible at all times.
●
The capacity rating plate, the decal informa-
tion, the hazard warnings and the operating
instructions must be checked to ensure that
they are consistent with the modifications
and must be amended if required.
●
Modifications must be designed, checked
and implemented by a design office that
specialises in industrial trucks. The design
office must comply with the standards and
directives valid at the time that modifica-
tions are made.
Decal information with the following data must
be permanently affixed to the truck so that it is
clearly visible:
●
Type of modification
●
Date of modification
●
Name and address of the company that car-
ried out the modification
Changes to the overhead guard
and roof loads
DANGER
In the event of the overhead guard failing due to a
falling load or the truck tipping over, there are po-
tentially fatal consequences for the driver. There is
a risk to life!
Welding and drilling on the overhead guard changes
the material characteristics and the structural design
of the overhead guard. Excessive forces caused by
falling loads or the truck tipping over may result in
buckling of the modified overhead guard and no pro-
tection for the driver.
–
Do not perform welding on the overhead guard.
–
Do not perform drilling on the overhead guard.
Safety
2
Basic principles for safe operation
35
56358042501 EN - - 11
Summary of Contents for RX60-60
Page 2: ......
Page 13: ...1 Foreword ...
Page 20: ...Overview Foreword 1 Your truck 8 56358042501 EN 11 ...
Page 41: ...2 Safety ...
Page 70: ...Safety 2 Emissions 58 56358042501 EN 11 ...
Page 71: ...3 Overviews ...
Page 83: ...4 Operating ...
Page 336: ...Operating 4 Decommissioning 324 56358042501 EN 11 ...
Page 337: ...5 Maintenance ...
Page 344: ...Maintenance 5 General maintenance information 332 56358042501 EN 11 ...
Page 381: ...6 1000 hour maintenance annual mainte nance ...
Page 385: ...7 Technical data ...
Page 398: ...Technical data 7 Fuse assignment 386 56358042501 EN 11 ...
Page 407: ......
Page 408: ...STILL GmbH 56358042501 EN 11 ...