Maintenance
5
1000-hour maintenance / Annual maintenance
1000-hour maintenance / Annual maintenance
Other tasks
– Perform all maintenance work; see the
"Maintenance" chapter.
7311_003-026
1
Checking theribbed V-belt
NOTE
If damage is identified, the ribbed V-belt must
be replaced to prevent failure or functional
problems.
– Crank the engine by hand while checking
the ribbed V-belt (1) for the following:
• Substructure cracks (initial cracks, core
breaks, crosswise cracks)
• Layer separation (top layer, tension mem-
bers)
• Blowout of the substructure
• Fraying of the tension members
• Edge wear (material removal, frayed edges,
edge hardening, surface cracks)
Checking the exhaust gas system
– Inspect the exhaust gas system for external
damage, secure fit, and leaks.
174749 EN - 03/2017
343
Summary of Contents for RX70-16
Page 1: ...Original instructions Diesel truck RX70 16 RX70 18 RX70 20 7311 7312 7313 174749 EN 03 2017 ...
Page 2: ......
Page 4: ......
Page 13: ...1 Foreword ...
Page 35: ...2 Safety ...
Page 49: ...Safety 2 Residual risk 174749 EN 03 2017 37 ...
Page 67: ...3 Overviews ...
Page 78: ...3 Overviews Operating and display elements 66 174749 EN 03 2017 ...
Page 79: ...4 Operation ...
Page 310: ...4 Operation Shutdown 298 174749 EN 03 2017 ...
Page 311: ...5 Maintenance ...
Page 318: ...5 Maintenance General maintenance information 306 174749 EN 03 2017 ...
Page 322: ...5 Maintenance General maintenance information 310 174749 EN 03 2017 ...
Page 354: ...5 Maintenance Remaining ready for operation 342 174749 EN 03 2017 ...
Page 359: ...6 Technical data ...
Page 367: ...Technical data 6 Ergonomic dimensions 174749 EN 03 2017 355 ...
Page 378: ......
Page 379: ......
Page 380: ...STILL GmbH 174749 EN 03 2017 ...