4
Operation
Lifting
1
2
6210_003-027
Removal
– Select a pallet corresponding to the fork arm
size.
– Set down the pallet next to the fork carriage
on the side chosen for removal.
– Lift the fork carriage until the fork arms are
approx. 3 cm above the pallet.
– Apply the parking brake.
– Remove the switch key.
– Unscrew the locking screw (2) on the side
chosen for removal.
– Pull up the locking lever (1) and push the
fork arms onto the pallet one after the other.
Installation
– Make sure that the locking screw is un-
screwed on the side chosen for installation.
– Place the fork arms on a pallet next to
the fork carriage on the side chosen for
installation.
– Pull up the locking lever (1) and push the
fork arms onto the fork carriage one after
the other.
– Place the fork arms in the required position
and push down the locking lever. Ensure
that the locking lever snaps into place.
– Screw in and tighten the locking screw (2).
DANGER
There is a risk of fatal injury from a falling load or
fork!
– Tighten the locking screw each time a fork is
changed.
– Driving and moving loads without the locking
screw is prohibited.
NOTE
If the truck is equipped with the "load measu-
rement" comfort feature, a "zero adjustment of
the load measurement" must always be per-
formed after the fork arms have been chan-
164
57348011850 EN - 02/2019 - 11
Summary of Contents for RX70-40
Page 2: ......
Page 4: ......
Page 13: ...1 Foreword ...
Page 33: ...2 Safety ...
Page 66: ...2 Safety Emissions 54 57348011850 EN 02 2019 11 ...
Page 67: ...3 Overviews ...
Page 78: ...3 Overviews Operating devices and display elements 66 57348011850 EN 02 2019 11 ...
Page 79: ...4 Operation ...
Page 320: ...4 Operation Decommissioning 308 57348011850 EN 02 2019 11 ...
Page 321: ...5 Maintenance ...
Page 328: ...5 Maintenance General maintenance information 316 57348011850 EN 02 2019 11 ...
Page 332: ...5 Maintenance General maintenance information 320 57348011850 EN 02 2019 11 ...
Page 334: ...5 Maintenance General maintenance information 322 57348011850 EN 02 2019 11 ...
Page 364: ...5 Maintenance Preserving operational readiness 352 57348011850 EN 02 2019 11 ...
Page 371: ...6 Technical data ...
Page 382: ...6 Technical data Fuse assignment 370 57348011850 EN 02 2019 11 ...
Page 391: ......