Operation
4
Handling loads
6210_800-007
– Insert the fork as far under the load as
possible. Stop the truck as soon as the
fork back is resting on the load. The centre
of gravity of the load must be positioned
between the fork arms in the middle.
6210_800-008
– Lift the fork carriage until the load is resting
entirely on the forks.
DANGER
Risk of accidents!
– Beware of any people in the danger area.
– Ensure that the roadway behind you is clear.
DANGER
Never tilt the lift mast with a raised load due to the
risk of tipping!
– Lower the load before tilting the lift mast.
– Move backwards carefully and slowly until
the load is clear of the racking. Brake gently.
57348011850 EN - 02/2019 - 11
179
Summary of Contents for RX70-40
Page 2: ......
Page 4: ......
Page 13: ...1 Foreword ...
Page 33: ...2 Safety ...
Page 66: ...2 Safety Emissions 54 57348011850 EN 02 2019 11 ...
Page 67: ...3 Overviews ...
Page 78: ...3 Overviews Operating devices and display elements 66 57348011850 EN 02 2019 11 ...
Page 79: ...4 Operation ...
Page 320: ...4 Operation Decommissioning 308 57348011850 EN 02 2019 11 ...
Page 321: ...5 Maintenance ...
Page 328: ...5 Maintenance General maintenance information 316 57348011850 EN 02 2019 11 ...
Page 332: ...5 Maintenance General maintenance information 320 57348011850 EN 02 2019 11 ...
Page 334: ...5 Maintenance General maintenance information 322 57348011850 EN 02 2019 11 ...
Page 364: ...5 Maintenance Preserving operational readiness 352 57348011850 EN 02 2019 11 ...
Page 371: ...6 Technical data ...
Page 382: ...6 Technical data Fuse assignment 370 57348011850 EN 02 2019 11 ...
Page 391: ......