Maintenance
5
Safety regulations for maintenance
Working on the electrical equipment
Work may only be performed on the electrical
equipment of the truck when it is in a voltage-
free state. Function checks, inspections
and adjustments on energised parts must
only be performed by trained and authorised
persons, taking the necessary precautions
into account. Rings, metal bracelets etc.
must be removed before working on electric
components.
To prevent damage to electronic systems
with electronic components, such as an
electronic driving regulator or lift control, these
components must be removed from the truck
prior to the start of electric welding.
Work on the electrical system (e.g. connecting
a radio, additional headlights etc.) is only
permitted with approval from the authorised
service centre.
Working on the ignition system
To prevent personal injury and/or destruction
of the ignition system, please observe the
following:
• Only connect and disconnect ignition
system lines, including high-voltage lines
and measuring device lines, with the ignition
switched off.
• If the engine is to be operated at starting
speed but not actually started (e.g. for a
compression pressure test), disconnect the
connection assembly from the ignition coil.
• Use of a quick charger to jump start the
engine is only permitted for a period of up to
1 minute at max. 16.5 volts.
• The engine may only be washed when the
ignition is switched off.
• When performing electric or point welding,
completely disconnect the battery.
• Trucks that have a fault in the ignition
system, or a suspected fault, may only be
towed if the plug is disconnected from the
ignition coil.
57348011850 EN - 02/2019 - 11
311
Summary of Contents for RX70-40
Page 2: ......
Page 4: ......
Page 13: ...1 Foreword ...
Page 33: ...2 Safety ...
Page 66: ...2 Safety Emissions 54 57348011850 EN 02 2019 11 ...
Page 67: ...3 Overviews ...
Page 78: ...3 Overviews Operating devices and display elements 66 57348011850 EN 02 2019 11 ...
Page 79: ...4 Operation ...
Page 320: ...4 Operation Decommissioning 308 57348011850 EN 02 2019 11 ...
Page 321: ...5 Maintenance ...
Page 328: ...5 Maintenance General maintenance information 316 57348011850 EN 02 2019 11 ...
Page 332: ...5 Maintenance General maintenance information 320 57348011850 EN 02 2019 11 ...
Page 334: ...5 Maintenance General maintenance information 322 57348011850 EN 02 2019 11 ...
Page 364: ...5 Maintenance Preserving operational readiness 352 57348011850 EN 02 2019 11 ...
Page 371: ...6 Technical data ...
Page 382: ...6 Technical data Fuse assignment 370 57348011850 EN 02 2019 11 ...
Page 391: ......