6
1000-hour maintenance/annual maintenance
Other tasks
Other tasks
– Perform all tasks required to maintain
full operability; see the chapter entitled
"Remaining ready for operation".
Checking the exhaust gas
system
– Inspect the exhaust gas system for external
damage, secure fit, and leaks.
7341_003-053
Checking the lift cylinders and
the hydraulic connections for
leak tightness
WARNING
Risk of injury!
Observe safety regulations for working on the lift
mast, see the "Working at the front of the truck"
chapter.
– Check the lift cylinders and the hydraulic
connections for leak tightness (visual
inspection).
– Have any leaking lift cylinders and hydraulic
connections repaired by the authorised
service centre.
368
57348011800 EN - 11/2018
Summary of Contents for RX70 Series
Page 2: ......
Page 4: ......
Page 13: ...1 Foreword ...
Page 21: ...Foreword 1 Your truck 57348011800 EN 11 2018 9 ...
Page 38: ...1 Foreword Environmental considerations 26 57348011800 EN 11 2018 ...
Page 39: ...2 Safety ...
Page 53: ...Safety 2 Residual risk 57348011800 EN 11 2018 41 ...
Page 71: ...3 Overviews ...
Page 83: ...4 Operation ...
Page 321: ...5 Maintenance ...
Page 328: ...5 Maintenance General maintenance information 316 57348011800 EN 11 2018 ...
Page 330: ...5 Maintenance General maintenance information 318 57348011800 EN 11 2018 ...
Page 334: ...5 Maintenance General maintenance information 322 57348011800 EN 11 2018 ...
Page 378: ...5 Maintenance Remaining ready for operation 366 57348011800 EN 11 2018 ...
Page 379: ...6 1000 hour maintenance annual mainte nance ...
Page 383: ...7 Technical data ...
Page 391: ...Technical data 7 Ergonomic dimensions 57348011800 EN 11 2018 379 ...
Page 394: ...7 Technical data Fuse assignment 382 57348011800 EN 11 2018 ...
Page 404: ......
Page 405: ......
Page 406: ...STILL GmbH 57348011800 EN 11 2018 ...